Rate Schedule
Rates do not include the Power Cost Adjustment
The PCA represents an additional charge (credit) per kwh for power purchased from Hoosier Energy not included in the base retail rates of Clark County REMC. The amount will change monthly.The power cost adjustment is printed on your monthly bill.
The PCA effective for April billing cycle is -$.000882 kWh or –88¢ per 1,000 kWhs.
Rate Schedule
Residential:
Facility Charge: $ 31.50
per month
Energy Charge: $ .10135 per kWh
Residential
Time of Use:
Applicable to
single-phase residential electric service supplied through a single delivery
point with installed transformer capacity of 50 kVA or less. Members with annual kWh requirements of
12,000 kWh or more will be considered eligible for this rate schedule. The capacity of individual motors served
under this schedule shall not exceed ten (10) horsepower without consent from
the Corporation. Member must remain on
the rate a minimum of twelve months.
Facility Charge: $ 32.25per month
On-Peak Energy Charges $ .16728 per kWh
On-peak time periods:
January, February and December
Monday through Friday
7 a.m. to 10 a.m.
6 p.m. to 9 p.m.
June, July and August
Monday through Friday
12:00 Noon to 10 p.m.
Off-Peak Energy Charges $ .08429 per kWh
Off-peak time periods:
- All weekends
- July 1, December 25, January
1
- Every day in March, April,
May
- Every day in September,
October, November
January, February and December
Monday through Friday
10 a.m. to 6 p.m.
9 p.m. to 7 a.m.
June, July and August
Monday through Friday
10 p.m. to 12:00 noon
Small
Commercial - Single Phase
Facility Charge: $ 31.50
per month
Energy Charge: $ .10135
per kWh
Small
Commercial – Multi-Phase
Facility Charge: $110
per month
Energy Charge: $ .09353
per kWh